Skip to content

Plot 5606,

Lufubu Road, Kalundu, Lusaka.

Phone Number

+260 211 290 458

Email us on

info@laatu.co.zm

  • Home
  • About Us
  • Services
    • Substation Installation
    • Rehabilitation
    • Construction
    • Cabling
    • Commissioning
    • Grid Extension and Intensification
  • Projects
    • On Going
    • Completed Projects
  • News
  • Contact Us
Menu
  • Home
  • About Us
  • Services
    • Substation Installation
    • Rehabilitation
    • Construction
    • Cabling
    • Commissioning
    • Grid Extension and Intensification
  • Projects
    • On Going
    • Completed Projects
  • News
  • Contact Us
Get a Quote

ZESCO Limited – Power Evacuation for Ngwerere 33/11KV Substation

  1. Home>
  2. ZESCO Limited – Power Evacuation for Ngwerere 33/11KV Substation

ZESCO Limited – Power Evacuation for Ngwerere 33/11KV Substation

Client Name: ZESCO Limited

Project description:

Power Evacuation for Ngwerere 33/11KV Substation – Lot 1 and Katuba 33/11KV Substation – Lot 2 under Contract Number ZESCO/035/2014.

  • Construct 7,200m of 1OOsqmm three phase tlrree wire 11kV overhead line from Ngwerere substation to the t-off into Roan Park which is 320m before This new feeder will also take up 4 other t-off from Ngwerere Main at D2349, D463, D459 and D455.
  • Uprate l ,360m of 25sqmm  ACSR, three phase three  wire  l lkV  overhead  line to l OOsqmm ACSR from D480 to PMT973
  • 4 x l7m of road boring of PHI road , Great East road and Chelston police camp road
  • Lay 8,800m of 3C x 185sqmm XLPE  l l kV looping cable from Chelston 33/1 l kV substation to Airport substation
  • Lay & terminate l 50m of 3C x l 85sqmm XLPE l lkV cable from Katuba 33/1 l kV substation to overhead
  • Construct a total of 350m of l OOmmsq ACSR 3 phase 3 wire l lkV OHL to link to the existing l lkV Kabangwe Feeder from 33/ 1lkV Kabangwe Substation
  • Extend and construct a total of 3,000m of I OOmmsq ACSR 3 phase 3 wire 11kV overhead line to link the new overhead line to the existing 11kV Matongo Feeder from 33111kV Chisamba Substation
  • Christopher Phiri
  • +260211361111

MAIN CONTRACTOR

Date:12/2014 to 12/2015

Related Portfolio

ZESCO LIMITED – Replacement of 11kV Switchboard and Construction of 11kV Switch room at Solwezi Substation

On-Going

ZESCO LIMITED – Replacement of 11kV Switchgear at Matero

On-Going

ZESCO LIMITED – Construction of Kozo Substation in Choma

On-Going

Laatu Energy Solutions Ltd is a fast-growing Zambian electrical engineering contracting company, specializing in the construction, installation, and maintenance of LV, MV, HV electrical supply systems.

Facebook Instagram Linkedin

Recent News

9 months ago
Maximizing Energy Efficiency Through Comprehensive Facility Commissioning
10 months ago
SMART METERS
10 months ago
POSSIBLE SOLUTIONS OF THE ENERGY CRISIS

Quick Link

  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy Policy
  • FAQ
  • Gallary

Copyright ©2024 Laatu Energy Solutions. All rights reserved | Powered by Ahava Consulting Limited

Request For A Quote

Please enable JavaScript in your browser to complete this form.
Loading